Burnt Church-Tradeport 115kV Transmission Line 51ÂÒÂ×»»ÆÞ Project

Type:Ìý°Õ°ù²¹²Ô²õ³¾¾±²õ²õ¾±´Ç²Ô
Scope: Performed a 12.2 mile 115kV transmission line construction project in an environmentally sensitive coastal salt marsh.
Location: Brunswick, Georgia

Client:ÌýGeorgia Transmission Corporation

In 2013, (“GTC”) contracted Irby to construct a 12.2 mile 115kv transmission line south of Savannah, Georgia including a 4 mile section through a protected salt marsh.

In service of the Coastal Electric Cooperatives service area, the project connected two radial transmission systems (Burnt Church and Tradeport) in Bryan and Liberty counties. In observance of the projects environmental sensitivity, Irby adapted a construction solution whereby poles were set by an helicopter to minimize the impact to marshland ecosystems.

Completed on time and within strict environmental parameters, the project exemplified Irby’s capability to plan and execute novel technical solutions to the highest standards of environmental best practice.

To see more on this project, watch produced by Georgia Transmission.

Start Date: April 2013
Completion Date: December 2013

 